----------

Showing posts with label Florida Institute of Technology (FIT). Show all posts
Showing posts with label Florida Institute of Technology (FIT). Show all posts

Friday, May 24, 2019

NASA selects Maxar to build first lunar Gateway element


NASA selects Maxar to build first Gateway element


Article Excerpt: "... NASA has selected Maxar Technologies to develop the first element of its lunar Gateway, the Power and Propulsion Element (PPE), for launch in late 2022. In a speech May 23 at the Florida Institute of Technology, NASA Administrator Jim Bridenstine said the agency picked Maxar to develop the spacecraft, which will provide electrical power for future elements of the Gateway ..."


Reference: spacenews.com